BlockOps Tour of Mid-size crypto mining facility Jan 2018

205
Published on January 27, 2018 by

500 KW facility with 400 miners – tour showing construction and some aspects of operation.

The 200 CFM or 5.6 CMM of airflow rule of thumb mentioned in the video is per miner.

Category Tag
Bank of Bitcoin Sign up

Add your comment